{"id":97,"date":"2026-05-05T10:05:12","date_gmt":"2026-05-05T06:05:12","guid":{"rendered":"https:\/\/dubangroup.com\/?p=97"},"modified":"2026-06-22T14:26:38","modified_gmt":"2026-06-22T10:26:38","slug":"mechanized-welding","status":"publish","type":"post","link":"https:\/\/dubangroup.com\/?p=97","title":{"rendered":"Welding Services"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">2026-May-25th <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In order to serve our clients in Oil &amp; Gas industry, offshore &amp; onshore Construction of pipeline, storage tanks, steel structures, we achieve to a joint venture agreement with Joeun Engineering Co. on 2026 February to submit our best quality and performance in welding of mentioned EPC projects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Joeun Eng. Co. (JEC) has gathered expert technicians, supervisors, welding operators, welding engineers and welders with more than 18 years experience of welding in different processes, relevant to offshore\/ onshore welding, especially in high tech and updated mechanized and semi-mechanized welding.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Duban management, is full command in oil &amp; gas industry, EPC projects contracting, management, administration and logistics; it&#8217;s consortium with JEC has made a powerful combination to serve client with best quality and performance in construction.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"540\" height=\"540\" src=\"https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/PFM-4.jpg\" alt=\"\" class=\"wp-image-115\" srcset=\"https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/PFM-4.jpg 540w, https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/PFM-4-300x300.jpg 300w, https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/PFM-4-150x150.jpg 150w\" sizes=\"auto, (max-width: 540px) 100vw, 540px\" \/><figcaption class=\"wp-element-caption\">Pipe Facing Machines, used for beveling of pipe ends based on designed required angles with several tools to give precise bevel angles.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"384\" height=\"148\" src=\"https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/ILUC3.png\" alt=\"\" class=\"wp-image-118\" style=\"width:542px;height:auto\" srcset=\"https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/ILUC3.png 384w, https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/ILUC3-300x116.png 300w, https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/ILUC3-150x58.png 150w\" sizes=\"auto, (max-width: 384px) 100vw, 384px\" \/><figcaption class=\"wp-element-caption\">Internal Line Up Clamps, used for fit up pipes with best possible alignment, gap and hi-lo and also to hold pipe till 2nd pass of welding finish and release it once required. <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"767\" src=\"https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/IMG-20210119-WA0012-1024x767.jpg\" alt=\"\" class=\"wp-image-122\" srcset=\"https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/IMG-20210119-WA0012-1024x767.jpg 1024w, https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/IMG-20210119-WA0012-300x225.jpg 300w, https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/IMG-20210119-WA0012-150x112.jpg 150w, https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/IMG-20210119-WA0012-768x575.jpg 768w, https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/IMG-20210119-WA0012.jpg 1080w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">GMAW Mechanized welding for pipeline, performing in several stations on pipelayer barge. <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"336\" height=\"225\" src=\"https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/pipe-welding-2-carriage-1.jpg\" alt=\"\" class=\"wp-image-125\" style=\"aspect-ratio:1.4933591699971742;width:376px;height:auto\" srcset=\"https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/pipe-welding-2-carriage-1.jpg 336w, https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/pipe-welding-2-carriage-1-300x201.jpg 300w, https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/pipe-welding-2-carriage-1-150x100.jpg 150w\" sizes=\"auto, (max-width: 336px) 100vw, 336px\" \/><figcaption class=\"wp-element-caption\">Combination of 2 welding carriage for both sides of each joint, to increase the production rate.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"893\" height=\"1024\" src=\"https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/WQT-photo-2-893x1024.jpg\" alt=\"\" class=\"wp-image-127\" srcset=\"https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/WQT-photo-2-893x1024.jpg 893w, https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/WQT-photo-2-262x300.jpg 262w, https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/WQT-photo-2-131x150.jpg 131w, https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/WQT-photo-2-768x880.jpg 768w, https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/WQT-photo-2-1340x1536.jpg 1340w, https:\/\/dubangroup.com\/wp-content\/uploads\/2026\/05\/WQT-photo-2-1787x2048.jpg 1787w\" sizes=\"auto, (max-width: 893px) 100vw, 893px\" \/><figcaption class=\"wp-element-caption\">Welding operators training and Welder Qualification Test; which will be performed before production upcoming.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">In order to receive catalogue, equipment list and organization charts; please do not hesitate to contact us. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>2026-May-25th In order to serve our clients in Oil &amp; Gas industry, offshore &amp; onshore Construction of pipeline, storage tanks, steel structures, we achieve to a joint venture agreement with Joeun Engineering Co. on 2026 February to submit our best quality and performance in welding of mentioned EPC projects. Joeun Eng. Co. (JEC) has gathered [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9],"tags":[13,14,18,15,16,20,19,22,11,10,17,21,12],"class_list":["post-97","post","type-post","status-publish","format-standard","hentry","category-welding","tag-construction","tag-fabrication","tag-fcaw","tag-gmaw","tag-gtaw","tag-mag","tag-mig","tag-mma","tag-offshore","tag-onshore","tag-smaw","tag-tig","tag-welding"],"_links":{"self":[{"href":"https:\/\/dubangroup.com\/index.php?rest_route=\/wp\/v2\/posts\/97","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dubangroup.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dubangroup.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dubangroup.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dubangroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=97"}],"version-history":[{"count":9,"href":"https:\/\/dubangroup.com\/index.php?rest_route=\/wp\/v2\/posts\/97\/revisions"}],"predecessor-version":[{"id":205,"href":"https:\/\/dubangroup.com\/index.php?rest_route=\/wp\/v2\/posts\/97\/revisions\/205"}],"wp:attachment":[{"href":"https:\/\/dubangroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=97"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dubangroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=97"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dubangroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=97"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}